Offshore EPCI

Shinfox Far East Company Pte Ltd (SFE)

Shinfox Far East Company Pte Ltd (SFE), established in Singapore, is an overseas reinvestment of Shinfox Energy. Our leadership team has extensive on-site experience in the construction and operations management of offshore wind power projects. The backbone of the team are industry leaders with years of experience in wind power industry and marine engineering and technology management. They have been involved in the construction and management of many large-scale projects.


Advantages

The Phase II Offshore Wind Power Project of Taipower

In November 2022, SFE and Foxwell Energy signed a subcontracting agreement for the TPC Offshore Wind Farm Phase 2. The main scope of work includes:

  • Foundation transport and installation service
  • Offshore substation EPCI service
  • Submarine cable transport, commissioning, installation and testing service
  • Wind turbine generator transport service

The offshore operations are planned to start in March 2024 and complete by the end of 2025 to deliver power to the grid as scheduled.

Service Procedure

A reliable supplier within the offshore wind industry for EPCI services

SFE works closely with manufacturing partners throughout the EPCI process from design to procurement and installation. Our current business covers:

In response to the growing demand of the international and Taiwan’s offshore wind market, SFE takes Singapore as a base for APAC expansion into fast-growth markets like Japan, South Korea, Vietnam, and Australia, aiming to become a leading provider of offshore services to the wind power industry in the Asia-Pacific region.



SFE Vessel Features

SFE Hercules - Heavy Lifting Vessel


Description Specification
LOA 200.8m
LPP 192.4m
Breadth 48.0m
Depth 16.0m
Max. Draft 11.5m
Design Draft 8.0m
Max. Speed 10.0knots
POB 130 (to be revisited and upgrade to 250)
Crane Capacity 4000MT @40m fixed lift,
heel 1.5-deg & trim 1.5-deg
3000MT @40m 360-deg revolving,
heel 3.5-deg & trim 2.0-deg
Allowable Deck Load 15MT/m2
DP DP2

SFE Developer – Wind Turbine Installation Vessel


Description Specification
LOA 132.06m
Lpp 128.60m
Breadth 48.00m
Depth 9.60m
Operation Water Depth 70m
Variable Deck load 6,000MT
Leg length 125m
Normal Jacking (Per Pinion) 252MT
Preloading Jacking (Per Pinion) 375MT
Ultimate Holding (Per Pinion) 646MT
Jacking Speed of Hull 0.45m/min
Jacking Speed of Leg 0.70m/min
DP DP1
POB 120

SFE Pioneer – Trenching Support Vessel / Installation Support Vessel


Description Specification
LOA 73.2m
Breadth 19.2m
Propulsion 6.222 BHP
Deck Area 430.0m2
Fuel Oil 900.0m3
Potable Water 760.0m3
Liquid Mud 1.057.7m3
Dry Bulk 340.0m3
Offshore Crane 1 x TTS Marine AHC Crane, SWL: 60T @ 12m
Accommodation 60
Helideck 19.2m, CAP 437

Inquire Now

[Head Office]
3 International Business Park, #04-08 Nordic European Centre, Singapore 609927
65-6513-9120 / 6513-9121

Do you have needs for offshore construction, engineering design, offshore transportation or installation procurement?